WEBVTT

00:00:00.110 --> 00:00:04.850
What the AMIC-2505 measures
with its three test voltages,

00:00:04.890 --> 00:00:08.210
how it is connected on a power
cable and on a transformer,

00:00:08.250 --> 00:00:11.030
and how to read its
absorption coefficients.

00:00:14.200 --> 00:00:19.500
Power and control cables, motors and low
and medium voltage switchgear are tested

00:00:19.540 --> 00:00:24.480
again and again, at commissioning,
after repairs, and at every inspection.

00:00:24.520 --> 00:00:28.160
A light hand-held meter, set
by a single rotary switch,

00:00:28.200 --> 00:00:30.700
makes long series of tests quick.

00:00:35.440 --> 00:00:42.820
test voltages, 500, 1000 and
2500 V, resistance up to 2 TΩ,

00:00:42.860 --> 00:00:49.340
a nominal test current of 1 mA, and
an AC and DC volt meter up to 600 V.

00:00:53.440 --> 00:00:59.820
The range depends on the voltage,
500 GHz at 500 V, 1 TΩ at 1 kV,

00:00:59.860 --> 00:01:04.800
and 2 TΩ at 2.5. Below the
voltage divided by 1 mA,

00:01:04.840 --> 00:01:09.600
the converter limits its current and
the accuracy is no longer specified.

00:01:12.270 --> 00:01:17.550
The three test sockets are on the top
edge, plus, minus and the guard G.

00:01:17.590 --> 00:01:24.050
The rotary switch picks 500, 1000
or 2500 V, or the voltmeter.

00:01:24.190 --> 00:01:28.970
START runs the test, interlocks it, and
the keys on the right set the parameters.

00:01:33.790 --> 00:01:40.390
set includes three test leads,
1.8 m long and rated 5 kV, in red,

00:01:40.430 --> 00:01:44.330
blue, and shielded black, with
a pin probe and crocodile clips.

00:01:44.370 --> 00:01:48.590
Also, the nickel metal hydride
battery pack and its charger,

00:01:48.630 --> 00:01:51.990
the case, the harness, and
the calibration certificate.

00:01:52.170 --> 00:01:57.110
Leads of 5 and 10 m and
a USB cable are options.

00:01:58.550 --> 00:02:01.170
The Routine Make the object dead.

00:02:01.210 --> 00:02:03.490
Turn the switch to the test voltage.

00:02:03.530 --> 00:02:05.930
The meter shows the voltage on the object.

00:02:05.970 --> 00:02:11.630
Connect the leads. Hold start, or press
enter while holding start to lock the test.

00:02:11.670 --> 00:02:15.930
At the end, the object is
discharged through 100 kΩ.

00:02:23.770 --> 00:02:26.870
On a power cable, each
conductor is measured

00:02:26.910 --> 00:02:29.630
against the others, shorted and earthed.

00:02:29.670 --> 00:02:34.070
Bond and earth L1, L2, L3, and N.

00:02:34.110 --> 00:02:38.970
The red lead, RISO+, goes to
the conductor under test,

00:02:39.010 --> 00:02:44.230
here PE, and the black lead,
RISO-, to the bonded group.

00:02:48.210 --> 00:02:51.430
Between the two windings of a transformer,

00:02:51.490 --> 00:02:55.550
surface current over the bushings and
the tank would add to the reading.

00:02:55.590 --> 00:02:59.750
Connect G to the tank. The
red lead goes to one winding.

00:02:59.790 --> 00:03:04.310
The black lead to the other, with
the terminals of each winding bonded.

00:03:08.200 --> 00:03:13.720
On a cable in bad weather, surface current
over the core insulation matters too.

00:03:13.760 --> 00:03:16.320
Wrap a metal foil round
the insulation of the

00:03:16.360 --> 00:03:18.840
conductor under test and connect it to G.

00:03:18.880 --> 00:03:23.460
Between two conductors, the
conductors not taking part go to G.

00:03:26.260 --> 00:03:31.240
The meter times the test at
fixed points, 15 or 30 seconds,

00:03:31.280 --> 00:03:34.720
1 minute and 10 minutes,
with a beep every 5 seconds.

00:03:34.760 --> 00:03:38.080
From them it calculates two
absorption coefficients,

00:03:38.120 --> 00:03:41.700
or DAR and PI if chosen in the setup.

00:03:45.900 --> 00:03:50.820
After the test, the arrow keys step
through the results, the resistance,

00:03:50.940 --> 00:03:53.160
the leakage current, both coefficients,

00:03:53.200 --> 00:03:56.120
and the resistance and
current at each time point.

00:03:56.160 --> 00:04:00.720
The leakage current tells how much
current really crosses the insulation.

00:04:04.740 --> 00:04:10.420
With the switch on U, the meter is an
AC and DC voltmeter up to 600 volts,

00:04:10.460 --> 00:04:12.500
to check that the object is dead.

00:04:12.540 --> 00:04:17.680
Between 25 and 50 volts of interference,
it still measures and shows noise.

00:04:17.720 --> 00:04:20.800
Above 50 volts the test is blocked.

00:04:25.280 --> 00:04:31.100
Measuring Category 4 at
600 volts, IP54, 1.3 kilos,

00:04:31.140 --> 00:04:35.420
and about 900 tests per charge of
the nickel metal hydride pack,

00:04:35.460 --> 00:04:37.520
recharged in about 3 hours.

00:04:39.580 --> 00:04:43.560
Power and control cables,
motors, transformers,

00:04:43.600 --> 00:04:46.240
and switchgear in low and medium voltage,

00:04:46.280 --> 00:04:49.180
and the periodic checks of
industrial maintenance.

00:04:50.640 --> 00:04:54.560
Insulation resistance
testing, from Amperis.