00:00:00.513 --> 00:00:05.308
What the AMIC-5010 measures, how
it is connected for two-lead,

00:00:05.348 --> 00:00:10.298
three-lead and continuity tests,
and how to read PI, DAR and DD.

00:00:13.163 --> 00:00:18.173
Insulation ages with heat, moisture
and dirt, long before it breaks down.

00:00:18.213 --> 00:00:21.355
Measuring its resistance
at a high DC voltage,

00:00:21.395 --> 00:00:25.920
and how that resistance changes
with time, shows the ageing early.

00:00:29.244 --> 00:00:35.874
Any test voltage from 50 volts to 5
kilovolts, resistance up to 15 teraohms,

00:00:35.914 --> 00:00:41.929
a test current of 1.2 or 3 milliamps,
and the indices PI, DAR and DD.

00:00:44.559 --> 00:00:46.655
Three test sockets on the right:

00:00:46.695 --> 00:00:50.192
plus, the guard G, and minus,
with a shielded socket.

00:00:50.232 --> 00:00:53.930
The rotary switch sets the
test voltage or the function.

00:00:53.970 --> 00:00:58.202
MENU and the F keys set the
parameters, and START runs the test.

00:01:02.745 --> 00:01:06.210
The case carries 3 test
leads rated 11 kilovolts,

00:01:06.250 --> 00:01:10.216
in red, blue and black, with
probes and crocodile clips.

00:01:10.256 --> 00:01:15.725
There is also the mains cable, the USB
cable and the calibration certificate.

00:01:15.765 --> 00:01:18.157
Leads up to 20 metres are options.

00:01:21.974 --> 00:01:25.511
Apply a DC voltage and the
current falls with time.

00:01:25.551 --> 00:01:27.967
The capacitance charges in seconds;

00:01:28.007 --> 00:01:32.666
the absorption current fades over
minutes; what remains is leakage.

00:01:32.706 --> 00:01:35.893
So sound insulation shows
a rising resistance,

00:01:35.933 --> 00:01:38.699
and damp or dirty insulation a flat one.

00:01:43.740 --> 00:01:46.113
Every test follows the same routine.

00:01:46.153 --> 00:01:50.470
Make the object dead, and keep it
earthed until the leads are on.

00:01:50.510 --> 00:01:55.029
Choose the voltage. Set times,
current and limit with MENU. Connect.

00:01:55.069 --> 00:01:57.308
Hold START, or lock it with ENTER.

00:01:57.348 --> 00:01:59.855
Then wait for the automatic discharge.

00:02:09.529 --> 00:02:11.501
Two leads, on a power cable.

00:02:11.541 --> 00:02:16.029
The other cores and the screen
are bonded together and earthed.

00:02:16.069 --> 00:02:19.766
The red lead, R ISO plus,
goes to that bonded group,

00:02:19.806 --> 00:02:25.371
and the black lead, R ISO minus, to the
core under test. Repeat for each core.

00:02:29.987 --> 00:02:33.673
With R ISO plus on the screen
and R ISO minus on the core,

00:02:33.713 --> 00:02:38.812
stray currents and electric fields in a
substation disturb the reading far less.

00:02:38.852 --> 00:02:42.088
A long cable can rebuild
its charge after the test,

00:02:42.128 --> 00:02:45.492
so earth its cores again
before you remove the leads.

00:02:49.285 --> 00:02:51.111
Three leads, on a transformer.

00:02:51.151 --> 00:02:53.414
The blue guard lead goes to the tank.

00:02:53.454 --> 00:02:56.835
The red lead goes to the
bonded high-voltage terminals,

00:02:56.875 --> 00:03:00.257
and the black lead to the
bonded low-voltage terminals.

00:03:00.297 --> 00:03:03.617
The result is the insulation
between the two windings.

00:03:09.129 --> 00:03:11.756
Current creeping over
a damp or dirty surface

00:03:11.796 --> 00:03:14.601
would add to the leakage
through the insulation.

00:03:14.641 --> 00:03:18.099
The G socket collects it and
leads it past the measurement,

00:03:18.139 --> 00:03:20.588
so only the volume resistance is measured.

00:03:24.854 --> 00:03:28.247
DAR divides the one-minute
reading by the 32nd reading.

00:03:28.287 --> 00:03:31.993
PI divides the ten-minute reading
by the one-minute reading.

00:03:32.033 --> 00:03:34.552
Being ratios, they depend far less on the

00:03:34.592 --> 00:03:37.424
size of the object than
the resistance itself.

00:03:42.872 --> 00:03:47.859
The step voltage test applies 5
rising voltages, up to 5 kilovolts:

00:03:47.899 --> 00:03:52.136
sound insulation gives the
same resistance at every step.

00:03:52.176 --> 00:03:57.539
Dielectric discharge measures the
current one minute into the discharge;

00:03:57.579 --> 00:04:00.465
a DD below two is good, above 7 is bad.

00:04:03.728 --> 00:04:09.680
Next to live high-voltage plant, the meter
tells mains voltage from induced voltage.

00:04:09.720 --> 00:04:14.458
Mains voltage blocks the test for
safety; induced voltage does not.

00:04:14.498 --> 00:04:20.022
Digital filters of 10, 30 or 60 seconds,
on the F one key, steady the reading.

00:04:25.203 --> 00:04:28.525
For protective conductors,
switch to R CONT:

00:04:28.565 --> 00:04:33.416
200 milliamps or more, in both
directions. First zero the leads:

00:04:33.456 --> 00:04:36.014
short them, press F two and START.

00:04:36.054 --> 00:04:41.363
Then red to the main earthing terminal,
and black to the exposed part.

00:04:45.572 --> 00:04:50.524
Results go to 990 memory cells,
and transfer over USB or Bluetooth.

00:04:50.564 --> 00:04:54.770
An Android app plots resistance
and leakage current live,

00:04:54.810 --> 00:04:58.123
so the operator can stay
clear of the object.

00:05:01.560 --> 00:05:04.326
Measuring category 4 at 600 volts.

00:05:04.366 --> 00:05:08.866
A case rated IP 67 when
closed. Minus 20 to 50 degrees.

00:05:08.906 --> 00:05:15.635
And a lithium iron phosphate battery good
for at least 1000 tests, or mains power.

00:05:19.141 --> 00:05:23.247
Power and distribution
transformers, motors and generators,

00:05:23.287 --> 00:05:27.041
medium-voltage cables and
switchgear, in power plants,

00:05:27.081 --> 00:05:32.100
industry and substations, including
work next to live busbars and lines.

00:05:33.877 --> 00:05:36.799
Insulation resistance
testing, from Amperis.