WEBVTT

00:00:00.510 --> 00:00:03.028
How the Shark 200 goes into the panel:

00:00:03.068 --> 00:00:07.807
mounting, current and voltage wiring
for wye systems, the power supply,

00:00:07.847 --> 00:00:13.462
RS-485 and an analogue output card, and the
settings that make its readings correct.

00:00:18.186 --> 00:00:22.190
CT and PT circuits can carry
lethal voltages and currents,

00:00:22.230 --> 00:00:27.837
so only qualified staff install it, with
gloves, glasses and protective clothing.

00:00:27.877 --> 00:00:31.602
The meter is secondary
protection only, never primary.

00:00:31.642 --> 00:00:36.692
And no dielectric test on its inputs,
outputs or communication terminals.

00:00:42.027 --> 00:00:45.872
For an ANSI cut-out, 4 threaded
rods go into the back,

00:00:45.912 --> 00:00:49.828
then the gasket, and a lock
washer and nut on each rod.

00:00:49.868 --> 00:00:53.210
For DIN, remove the studs
and snap two brackets

00:00:53.250 --> 00:00:57.886
into the grooves, with a number
8 screw each. Never over-tighten:

00:00:57.926 --> 00:00:59.756
0.4 newton metres at most.

00:01:04.455 --> 00:01:10.490
At the back: the current inputs, with high
terminals on top and low terminals below.

00:01:10.530 --> 00:01:14.107
The terminal strip carries
earth and power supply,

00:01:14.147 --> 00:01:16.711
then V ref and the 3 voltage inputs.

00:01:16.751 --> 00:01:22.786
In the middle, the two option slots, and on
the right, the RS-485 and KYZ connector.

00:01:26.408 --> 00:01:32.261
The CT leads can land on the studs with an
O or U lug, at one newton metre at most.

00:01:32.301 --> 00:01:38.083
Or the studs come off and the wire passes
straight through, up to 4.5 millimetres.

00:01:38.123 --> 00:01:40.426
Or quick-connect crimp terminals.

00:01:40.466 --> 00:01:42.982
In every case, keep the CT polarity.

00:01:49.306 --> 00:01:55.989
Voltage wires from 0.13 to 3.31 square
millimetres, each one through a 0.1 amp fuse.

00:01:56.029 --> 00:01:59.750
The supply goes through
a 3 amp slow-blow fuse,

00:01:59.790 --> 00:02:06.553
and the earth terminal straight to the
protective earth, with 2.5 square millimetres.

00:02:10.273 --> 00:02:16.331
The most common case: a three-phase,
four-wire wye with direct voltage and 3 C Ts.

00:02:16.371 --> 00:02:17.223
Earth first.

00:02:17.263 --> 00:02:23.097
Then each CT, through the shorting block,
polarity side to HI and return to LO.

00:02:23.137 --> 00:02:26.518
Then the 3 phase voltages
through their fuses,

00:02:26.558 --> 00:02:29.641
the neutral to V ref, and the supply last.

00:02:34.300 --> 00:02:36.989
Where phase B voltage is not available,

00:02:37.029 --> 00:02:41.047
the two and a half element wye
measures it without a wire.

00:02:41.087 --> 00:02:43.776
The 3 C Ts are wired exactly as before.

00:02:43.816 --> 00:02:46.855
Only phases A and C and
the neutral come in,

00:02:46.895 --> 00:02:50.354
and at the terminal strip
V b is bridged to V ref.

00:02:53.955 --> 00:02:56.725
Each service has its setting on the meter,

00:02:56.765 --> 00:03:00.405
and it must match the wiring
or every reading is wrong.

00:03:00.445 --> 00:03:05.757
With P Ts the wiring is the same, but the
voltages come from the PT secondaries.

00:03:05.797 --> 00:03:08.634
In a three-wire delta,
two C Ts are enough:

00:03:08.674 --> 00:03:11.109
their returns go through the B input.

00:03:17.751 --> 00:03:21.607
From the front: MENU, down
arrow to CFG and ENTER.

00:03:21.647 --> 00:03:25.425
Set the CT numerator and
scale, the PT numerator,

00:03:25.465 --> 00:03:28.387
denominator and scale, and the hookup.

00:03:28.427 --> 00:03:31.270
Then address, baud rate and protocol.

00:03:31.310 --> 00:03:34.698
MENU twice, store all,
and the meter resets.

00:03:34.738 --> 00:03:39.218
If it asks for a password, it
is in the manual: change it.

00:03:45.452 --> 00:03:49.887
The ratios go in as numerator and scale.

00:03:49.927 --> 00:03:56.599
2000 to 5 amps is simply 2000.
10000 to 5 is 1000, scale 10.

00:03:56.639 --> 00:04:02.080
14400 to 120 volts is 14
40, over 1 20, scale 10.

00:04:06.642 --> 00:04:09.378
RS-485 is a two-wire, half duplex bus.

00:04:09.418 --> 00:04:12.154
From the converter to the first meter:

00:04:12.194 --> 00:04:15.441
plus to plus, minus to
minus, and the shield.

00:04:15.481 --> 00:04:19.385
Then from meter to meter, in
a chain, never in a star.

00:04:19.425 --> 00:04:23.622
Each meter needs its own address
before the bus is closed.

00:04:29.305 --> 00:04:32.827
Use shielded twisted pair,
earthed at one point.

00:04:32.867 --> 00:04:35.795
No more than two cables on any terminal,

00:04:35.835 --> 00:04:40.173
and long lines may need
termination resistors at both ends.

00:04:40.213 --> 00:04:44.996
If the settings are lost, for the
first 10 seconds after power-up

00:04:45.036 --> 00:04:49.597
the meter always answers at
address 1, 57600 baud, Modbus RTU.

00:04:56.597 --> 00:04:59.894
Option cards go in with
the meter disconnected.

00:04:59.934 --> 00:05:04.367
Unplug the voltage and supply
terminals, remove the slot cover,

00:05:04.407 --> 00:05:08.415
and slide the card along its
guide track until it clicks.

00:05:08.455 --> 00:05:14.095
Card one, card two, then the terminal
blocks and the RS-485 plug, in that order.

00:05:19.196 --> 00:05:23.234
The 4 to 20 milliamp card is
loop powered from outside.

00:05:23.274 --> 00:05:27.535
The loop supply feeds each
load, for example an RTU input,

00:05:27.575 --> 00:05:33.912
each load returns to its output channel, and
the common goes back to the supply minus.

00:05:33.952 --> 00:05:35.914
Up to 850 ohms at 24 volts.

00:05:41.762 --> 00:05:44.731
With the software of
the PC, connect through

00:05:44.771 --> 00:05:48.082
the RS-485 converter and
open the device profile.

00:05:48.122 --> 00:05:52.048
Check the CT and PT ratios and
the hookup, then the ports.

00:05:52.088 --> 00:05:54.989
Set the clock, which
comes on Eastern time,

00:05:55.029 --> 00:05:57.998
give the meter a name,
and send the profile.

00:05:58.038 --> 00:06:00.733
The meter reboots with the new settings.

00:06:10.268 --> 00:06:15.142
To check the installation, the load
bar shows current against full load:

00:06:15.182 --> 00:06:20.534
one segment from one percent, 10 segments
at 120%, and all flashing above that.

00:06:20.574 --> 00:06:24.765
For accuracy, the watt-hour pulse
gates a field test standard.

00:06:30.171 --> 00:06:32.715
Power network analysers, from Amperis.