WEBVTT

00:00:00.110 --> 00:00:04.030
What the TWR250B measures
on a power transformer,

00:00:04.070 --> 00:00:07.150
how all its windings are
connected in a single step

00:00:07.190 --> 00:00:10.650
and which tests then run
without touching a cable.

00:00:15.010 --> 00:00:19.750
Testing a power transformer usually
means one instrument for ratio,

00:00:19.790 --> 00:00:23.930
another for winding resistance, and
a new set of cables for each test,

00:00:23.970 --> 00:00:28.130
on a large transformer that has hours
of work up and down the bushings.

00:00:28.170 --> 00:00:34.970
The TWR250B connects to all the terminals
once, and every test runs from there.

00:00:40.020 --> 00:00:47.560
Up to 250 V AC for turns ratio and up
to 25 A DC for winding resistance.

00:00:47.600 --> 00:00:55.340
Ratios from 0.8 to 50,000 and resistances
from 0.1 micro-ohm to 100 kilo-ohms,

00:00:55.380 --> 00:00:58.340
with an internal battery
for sites without mains.

00:01:01.980 --> 00:01:05.460
tests share the same
connection, winding resistance,

00:01:05.500 --> 00:01:09.520
the dynamic test of the on-load
tap changer, demagnetization,

00:01:09.560 --> 00:01:13.040
turns ratio, phase angle,
and excitation current.

00:01:13.080 --> 00:01:16.220
The vector group is also
detected automatically.

00:01:22.430 --> 00:01:25.790
connection panel has 4H sockets
for the high-voltage side

00:01:25.830 --> 00:01:29.450
and 4X sockets for the
low-voltage side, color-coded.

00:01:29.490 --> 00:01:34.230
Beside them, the earth stud, the
temperature input, the discharge lamp,

00:01:34.270 --> 00:01:37.150
the tap changer control
and motor current sockets,

00:01:37.190 --> 00:01:39.510
the printer, and the emergency stop.

00:01:45.100 --> 00:01:48.700
In the lid, the 10.1-inch touchscreen.

00:01:48.740 --> 00:01:53.040
Test templates prepared in the office
make the field work a few touches.

00:01:53.080 --> 00:01:57.240
Beside it, the USB and
Ethernet interface to the PC,

00:01:57.280 --> 00:02:01.080
the flash drive port, and the
socket for the safety strobe light.

00:02:07.040 --> 00:02:11.900
It ships with the PC
software, the USB, Ethernet,

00:02:11.940 --> 00:02:15.720
mains and earth cables, and a
5-meter tap changer control cable.

00:02:15.760 --> 00:02:19.500
The standard set adds 4H
and 4X test leads of 10

00:02:19.540 --> 00:02:22.920
meters with TTA clamps
and the current clamp.

00:02:22.960 --> 00:02:27.040
Five, 15, and 20-meter
leads, a temperature sensor,

00:02:27.080 --> 00:02:30.540
a test shunt, and a verification
calibrator are options.

00:02:37.270 --> 00:02:40.010
a three-phase transformer, earth first.

00:02:40.050 --> 00:02:43.190
Then the 4H leads to the
high-voltage bushings.

00:02:43.230 --> 00:02:49.910
Red to H1, yellow to H2, blue to
H3, and black to the neutral H0.

00:02:49.950 --> 00:02:54.350
Then the 4X leads to the
low-voltage side in the same colors.

00:02:54.390 --> 00:02:56.590
Every bushing is now connected.

00:03:00.430 --> 00:03:04.690
On an auto transformer,
4H and 4X leads again.

00:03:04.730 --> 00:03:06.290
The difference is the neutral.

00:03:06.330 --> 00:03:12.790
Both the H and the X neutral leads go
to the common neutral bushing, H0X0.

00:03:15.580 --> 00:03:17.920
It also tests current transformers.

00:03:17.960 --> 00:03:22.940
Because the primary has only one or
two turns, the leads are reversed.

00:03:22.980 --> 00:03:26.340
H to the secondary
winding, X to the primary.

00:03:26.380 --> 00:03:28.360
With no primary terminals,

00:03:28.400 --> 00:03:32.560
the X1 and X0 leads are joined
and passed through the core.

00:03:35.520 --> 00:03:42.080
Winding resistance is measured with true,
ripple-free direct current up to 25 amps.

00:03:42.120 --> 00:03:46.060
With all six windings connected,
the instrument injects through

00:03:46.100 --> 00:03:49.840
the high and low-voltage windings
on the same core limb at once,

00:03:49.880 --> 00:03:53.780
so the core saturates sooner
and the reading settles faster.

00:03:57.980 --> 00:04:03.460
Four turns ratio, the instrument
applies up to 250 volts to the high

00:04:03.500 --> 00:04:07.940
-voltage windings and measures the
open-circuit voltages on the other side.

00:04:07.980 --> 00:04:12.620
Pick the vector diagram and it runs
the right test for star, delta,

00:04:12.660 --> 00:04:17.340
or zigzag without moving a lead and works
out the deviation from the nameplate.

00:04:20.140 --> 00:04:23.780
A DC test can leave the core magnetized,

00:04:23.820 --> 00:04:26.520
and so can taking the
transformer out of service.

00:04:26.560 --> 00:04:29.080
That remnants distorts later tests.

00:04:29.120 --> 00:04:35.380
The TWR250B removes it with a controlled
direct current of alternating polarity,

00:04:35.420 --> 00:04:38.300
decreasing step by step down to zero.

00:04:44.400 --> 00:04:49.020
built-in control unit drives the on-load
tap changer through the control cable,

00:04:49.060 --> 00:04:52.020
and the motor current is
recorded on its own channel.

00:04:52.060 --> 00:04:55.660
So one operator can test every
tap position automatically,

00:04:55.700 --> 00:05:01.740
and the dynamic test records each transition
with a resolution of one millisecond.

00:05:04.860 --> 00:05:07.860
Results appear as numbers
and graphs on the screen,

00:05:07.900 --> 00:05:10.860
and print straight away
on the 58 mm printer.

00:05:10.900 --> 00:05:15.280
The 32 GB card holds tens
of thousands of results.

00:05:15.320 --> 00:05:18.200
The PC software, with free updates,

00:05:18.240 --> 00:05:21.860
exports them to Excel and
builds the report in PDF.

00:05:26.650 --> 00:05:30.650
It is made for the commissioning and
maintenance of power transformers and

00:05:30.690 --> 00:05:35.610
autotransformers, three-phase and
single-phase, for tap changer diagnostics,

00:05:35.650 --> 00:05:40.250
for current transformers, and for the
winding resistance of motors and generators.

00:05:45.380 --> 00:05:48.360
Transformer testing from Amperis.