Video: Generators, bus ducts and step-up transformers: what to monitor in a power plant

Duration: 2:49 ·

Partial discharge through the stator RTDs, sensors on the bus duct and transformer moisture: 10 ppm when cold and 137 ppm when hot.

AI-generated video. The information must be validated by an Amperis engineer.

Article this video appears in

Video transcript

Generation assets: partial discharge in motors and generators, the bus that connects them, and what renewable duty cycles are doing to the transformers at the other end. In a rotating machine it is the insulation that fails, so the measurement that matters is partial discharge. The measurement itself is a tiny, high-frequency current, and where you listen for it decides whether you find anything. And here is the key idea.

The machine already has sensors buried in the stator winding: the temperature RT Ds. They can be used to detect partial discharge as well. Which gives something conventional testing struggles with: location. Compare the magnitude seen at each RTD around the stator, and the defect is near the one reading highest. The bus duct between machine and transformer starts with an objection. It is an inert system with no moving parts, so why spend anything on it? And the sensor used there is elegant.

A ground path current sensor sits at earth potential on the outside of the enclosure, so there is no high voltage risk, and the polarity of the pulse tells you which side of the joint the discharge came from. On the isolated-phase bus of a power plant, a disconnect switch was being watched by both partial discharge and temperature. The temperature tripped twice. The discharge had been climbing steeply for at least two months before the first of those trips.

The generator step-up transformer is treated differently from a network transformer, because it is not replaceable in a hurry and it never rests. Renewables have changed the job. A transformer in a battery storage or wind installation no longer has a steady load profile: it has a duty cycle, and each part of that cycle attacks something different. One consequence of that cycling deserves its own scene, because it catches people out.

Moisture moves between paper and oil with temperature, so the same transformer reads 10 parts per 1000000 cold and over a 100 hot. And here is what goes wrong in practice. Five things to take away. Generation asset monitoring, from Amperis.

Got a test to solve? Talk to an engineer.

Tell us the asset, the voltage and the test you need, and we will propose the right instrument.