pre-insertion resistor

A resistor switched in a few milliseconds before the main contact of a breaker closes, to damp the switching overvoltage.

Closing a high-voltage breaker onto a long line or a capacitor bank produces a transient that can reach several times rated voltage. To soften it, some breakers carry an auxiliary contact in series with a resistor which closes a few milliseconds ahead of the main contact and limits the inrush current.

The timing test has to verify two things: the ohmic value of that resistor and the pre-insertion time, that is, how many milliseconds it stays in circuit before the main contact bypasses it. Both drift as the mechanism ages.

Detecting it requires the analyzer to distinguish three states rather than two — open, through the resistor, and closed — within the same record. Sets that cannot do this simply read an early close and report an incorrect time.

Equipment for this measurement

See the range

Got a test to solve? Talk to an engineer.

Tell us the asset, the voltage and the test you need, and we will propose the right instrument.

+34 982 20 99 20 Mon–Thu 09:00–14:00 · 15:30–19:00Fri 08:00–14:00 Request a quote